Assessing the Readiness for Kesidang Machine Production Preparation
(11/07/2023)
Arrival of Kesidang Machine’s Material for The First Time
(18/07/2023)
Dr. Amir’s Presentation on Kesidang Machine Production Operations to Students
(20/07/2023)
Activities Involving Inspection and Identification of Kesidang Machine Components
(21/07/2023)
Explanation Session on the Kesidang Machine Assembly Project by Dr. Amir
(25/07/2023)
Tool Labeling for Kesidang Machine Equipment
(25/07/2023)
Kesidang Machine Project Student Explanation Session with Dr. Amir
(31/07/2023)
Visiting the Epoxy-Finished Kesidang Machine Installation Site
(03/08/2023)
Tape Line Patching Activity in the Kesidang Machine Assembly Room
(09/08/2023)
Teaching Factory Welcomes Owl House Company for Collaboration Discussion
(17/08/2023)
Signage Installation in the CNC Kesidang Machine Assembly Room
(14/09/2023)
Dr. Amir and Interns Collaborate on Upgrading Kesidang Machine Assembly Room
(21/09/2023)
Installation of Wallpaper in the CNC Kesidang Machine Assembly Room by Students
(02/10/2023)
Assembly of CNC Kesidang Machines by Students
(03/08/2023)
Visit from the Indonesian UNIBA delegation of 4 people to inspect
the CNC Kesidang Machine assembly room
(03/11/2023)
Received a visit from the CEO of Sirim Calibration Malaysia and his entourage
to the CNC Kesidang machine assembly room
(09/11/2023)
Coolant testing session for CNC Kesidang Machine
(22/11/2023)
CNC Kesidang Machine testing session with Technician Kamaruddin from FTKIP
(23/11/2023)